Krupashankar Packers & Movers Book Now

For businesses moving premises

Office shifting, planned around downtime

An office move is a scheduling problem before it is a transport problem. We plan the sequence by department so files and equipment arrive where they are needed, not in one pile.

  • Out-of-hours and weekend loading
  • Department-wise labelling
  • Workstations dismantled and rebuilt
  • IT equipment boxed separately
Workers carrying a wrapped item through a building corridor during an office move
Carrying through a commercial corridor

Planning

The sequence we agree before the date

  1. 01

    Walk the floor

    We look at what is being moved, what is being left behind, and how the new floor is laid out. That decides the load order more than the number of desks does.

  2. 02

    Label by department

    Every box and workstation gets a department and a destination position. Unloading then happens zone by zone instead of room by room.

  3. 03

    Separate the sensitive items

    Laptops, monitors and servers are boxed and numbered separately from furniture. Documents are boxed by cabinet and kept upright where required.

  4. 04

    Load after hours

    Most office moves load on a Friday evening or over a weekend so the building lift and parking are free and the team is not working around the move.

  5. 05

    Rebuild and hand over

    Workstations are reassembled in the agreed layout, boxes are placed at their labelled positions, and anything that could not be rebuilt is flagged on the spot.

IT and documents

The two things that stop work resuming

Furniture arriving late is inconvenient. Laptops and files arriving to the wrong floor is a lost working day. They are packed and tracked separately for that reason.

Equipment is boxed with its cables bagged and labelled with the asset or user name. Cabinets are moved with drawers secured and contents ordered, so a filing system is not rebuilt from scratch on Monday morning.

  • Each laptop and monitor boxed and numbered against a list
  • Cables and accessories bagged with the device they belong to
  • Filing cabinets moved with contents retained where the locks allow
  • Server and network equipment handled only in the order your IT contact specifies

Network, server and telephone systems may need your IT provider on site. We move the equipment; we do not reconfigure systems.

Dark interior of a closed truck with wrapped furniture and a sofa loaded inside
Furniture loaded for a commercial move.

Scope

Typical office move split

ItemPosition
Desks, chairs, storage and loose furnitureIncluded in the quoted scope
Dismantling and reassembly of standard workstationsIncluded when listed in the quote
Packing of loose items and filesIncluded when packing is quoted
IT and network equipmentMoved as boxed equipment; reconnection is by your IT provider
Specialist items such as servers or lab equipmentSeparate scope, agreed in writing
Building lift, loading bay and after-hours permissionsArranged by the client with the building management

Confirm lift access, loading bay booking and after-hours permission with both buildings before the move date. These are the most common cause of delay.

Before the move

What the client usually handles

  • Nominate one person on each floor who can answer questions during the move.
  • Get written approval from both buildings for the lift, loading bay and timing.
  • Back up and shut down IT equipment; keep servers with your IT provider until transport is agreed.
  • Clear personal items and anything confidential that should not leave the office in a carton.
  • Share the new floor layout so workstations can be placed correctly at the other end.

Questions

Office relocation questions

Can you move an office overnight?

Overnight and weekend loading is common for offices. The realistic limit is how much can be packed in advance; a large floor usually needs more than one evening.

Do you move servers and network equipment?

Equipment can be moved as boxed cargo with the handling instructions your IT contact gives. Shutdown, transport protection and reconfiguration should be coordinated with your IT provider.

How is an office move priced?

Mainly by volume, the amount of dismantling and reassembly, packing required, access at both buildings, and whether the job runs after hours. A floor plan and a count of workstations narrows it quickly.

Can we move in phases?

Yes, and for larger offices it is usually the better plan. Moving a department at a time keeps the business running and makes unloading much easier to check.

Office move

Send the floor and the date

Number of workstations, both addresses and the timing window you can allow — that is enough to start.

Book Now on WhatsApp

Prefer to write the number down? +91 80551 82811

Book Now on WhatsApp